Example 1 · Typical request
- Crane or access solution — quoted cost
- 0 € / your currency
- Crane mobilisation and dismantling
- 4 days
- Access works — road, platform, ground reinforcement
- 6 days
- Closures, permits or possessions needed
- 2 days
- Actual lifting days with the crane
- 2 days
- Expected helicopter lift days
- 1 days
- Helicopter-side preparation — approvals, rigging, site prep
- 3 days
- Cost of one day of delay or downtime
- 0 € / your currency
Calendar days the air option would save
10.0 days
- Crane route — total days: 14.0 days
- Air route — total days: 4.0 days
- Value of the days saved: Not entered
- Ground solution cost you hold: Not entered
Sample request text sent for human review
Method comparison (buyer's own figures): crane/access route 14.0 days total (mobilisation 4, access works 6, closures 2, lifting 2). Air route 4.0 days (preparation 3, lifting 1). Days difference 10.0, no delay cost supplied.