Manila airport helicopter transfers
MNLNinoy Aquino International
Can I fly by helicopter from Manila Airport (MNL) to Makati or BGC?
Yes — MNL to the Makati and BGC rooftop helipads is 8–12 minutes, against 45–120 minutes on EDSA depending on the hour.
Real human · 24/7 · Quotes issued in PHP, USD or EUR
Onward destinations, in the order travellers actually ask for them
| Destination | Helicopter | Alternative | Landing reality |
|---|---|---|---|
| Makati / BGC helipads | ~10 min | 45–120 min by car on EDSA | Approved rooftop pads |
| Tagaytay | ~20 min | 2–3 h by road | Resort and estate pads |
| Clark (CRK) | ~30 min | 2–3 h by road | Airport apron |
| Balesin Island | ~50 min | Road plus boat, most of a day | Island pads, club approval required |
Times are typical block times for the aircraft usually available in this market, not a schedule. Every leg is priced per mission for the whole aircraft; the quote depends on aircraft, date, positioning and landing permissions.
Estimate Manila airport transfers yourself with the helicopter vs car & ferry calculator, the helicopter charter cost calculator and the passenger & luggage calculator. All tools sit together in the helicopter calculators hub.
Manila rotary transfers stage from the general aviation side with prior coordination; rooftop pads need building consent.
Rooftop work is weight-critical — one soft bag plus a cabin bag per passenger.
The shortest curated leg is about 10 minutes; the ground or water alternative on the same pairing is measured in hours, not minutes.
Manila jet arrivals clear at the GA terminals before the onward rotary leg is flown as a separate charter.
Jet-to-helicopter connections →Continue planning from Manila
The market hub, the mission page and the calculators that use the same geo data as this page.
Corporate travel departments, Manila hotel concierges and island club operators.
SkyMatch partner programme →SkyMatch is an independent sourcing and concierge platform. Flights are operated by independent licensed operators; aircraft are subject to availability, landing is subject to local authority and property approval, and weather or operational restrictions may apply. The final quote depends on the mission details.